Tops are available with a shallow depression to receive vinyl or sim ilar types of floor tile fig.
Floor cleanout requirements.
The cap closer to your home provides easy access to the city end while the cap closer to the street allows you to maintain the house end of the lateral.
2 or with a lock in design to receive terrazzo or ceramic tile fill fig.
Pumps or ejectors that.
Upc 707 10 cleanout fittings shall be not less in size than those given in table 7 6.
Astm d2729 poly vinyl chloride pvc sewer pipe dimensions dimensions of poly vinyl chloride pvc sewer pipes with belled end.
Upc 707 11 cleanouts shall be provided for pressure drainage systems as classified under section 710 7.
Or use the top of the crawlspace floor if the only area that has proper openings is the garage.
A drain cleanout provides access to your main sewer line and is located outside of your home in the front or back yard.
Capacities of sewer pipes carrying capacity of sewer and wastewater pipes gpm and liter per second.
Following guidelines to determine the lowest floor for rating.
A cleanout installed in a floor or walkway that will not have a trim cover installed shall have a countersunk plug installed so the top surface of the plug is flush with the finished surface of the floor or walk way.
Dimensions sizes and dimensions of pipes and tubes and their fittings inside and outside diameter weight and more.
708 1 9 required plumbing drain clearance cleanouts for 6 inch 153 mm and smaller piping shall be provided with a clearance of not less than 18 inches 457 mm from and perpendicular to the face of the opening to any obstruction.
Double clean out the most popular type used for modern installation the double clean out has two shafts which connect to the lateral pipe forming a u shape.
A sewage pump or sewage ejector shall have the capacity and head for the application requirements.
Cleanouts typically go unnoticed until there is a problem.
All three types of finished floor tops are available in round or square patterns.
Cleanouts zurn plumbing products groupspecification drainage operation 1801 pittsburgh avenue erie pa 16502 phone 814 455 0921 fax.
A two way cleanout installation that is approved for meeting the requirements of section 708 1 3.
Use the top of the crawlspace under floor space floor or the garage floor whichever is lower if neither the crawlspace nor the garage has proper openings.
Shown cleanout tops are available with a recess to receive the floor mate rials.
3 1 2 22126 007 4 1 2 22126 008 5 1 2 22126 009 6 1 2 22126 001.
A two way cleanout installation that is approved for meeting the requirements of section 708 1 3.