The duct has r6 insulation which contains 33 more insulation than the standard r4 2 product.
Flexible ac duct installation.
How to install insulated flex duct 1.
Measure the distance between the plenums or collars where the flexible duct installs.
Cut the flex duct to the.
Do not install in the compressed state or use excess length as this will noticeably increase friction losses.
Flexible ductwork is often made from flexible metals such as tin or aluminum also metal fiberglass or plastic.
Follow the manufacturer s instructions but in case they get lost here is a list of best practices for supporting ducts.
Insulated flexible duct r6 silver jacket is used in standard heating and air conditioning hvac systems and some venting applications.
The supports need to be at the manufacturer s recommended spacing but no longer than 4 maximum.
Installation of flexible ducts shall be listed and labeled to standard ul 181b closuresystemsforusewithflexibleairductsandairconnectors non metallic fastenersarelimitedto6inchw g maximumpositivepressure.
There s no question that flexible duct is easier to install than metal ductwork but consider this.
Flexible ductwork is a very popular because it is easy to install and has great insulation potential.
Supports should be at least 1 inches wide.
Flexible duct performance in stallation standards 5th edition figure 8 correct.
The most typical duct replacement cost range of 175 400 per duct includes removal of old duct and supply register installation of the new flexible or metal duct labor costs and disposal of all old materials.
It collects dust and is almost impossible to clean.
Flexible duct can degrade over time.
Spread a thin layer of mastic.
4 4 installation and usage install ducts fully extended.
Average do it yourself cost 1 25 linear foot average contractor installed cost.
The master flow 4 in.
Some kinds of flexible ductwork can also be made from vinyl insulation which is extremely easy to fit on your own.
The straps that hold up the flex duct need to be no less than 1 5 wide.
Roll back the plastic or foil jacket and the fiberglass lining approximately 8 to 12 inches from the inner core.
Space supports no more than 4 feet apart a connection to a rigid duct or to equipment counts as a support point.